![]() Phase 2 – re-aligned Hillsborough Road to the south side of the original Hillsborough Road junction will require weekday lane closures (using 4 Way Traffic Control) from Monday 13 November 2023 until Friday 22 December 2023, between the hours of 9.30am and 4.30pm.Phase 1 – 100 metres south of Knockbracken Road / Gransha Road junction to the re-aligned Hillsborough Road will require weekday road closures for the duration of the works from Monday 11 September 2023 until Tuesday 5 December 2023, between the hours of 9.30am and 4.30pm.To facilitate the scheme, it will be necessary to implement the works in two separate phases. The resurfacing scheme, which extends 100 metres south of Knockbracken Road / Gransha Road junction to Hillsborough Road, will deliver significant benefits for residents and road users. The contractor has made significant progress implementing this scheme and the initial programme has been revised below: -Ī carriageway and footway resurfacing scheme on A23 Moneyreagh Road, Moneyreagh will commence on Monday 11 September 2023. ![]() Pedestrian access will be maintained at all times. ![]() Road users are asked to comply with the temporary traffic restrictions and to drive with care when travelling through the works. ![]() Whilst the Department has carefully planned these works and associated traffic management with the contractor in order to minimise inconvenience to the public, road users should expect some delays and allow additional time when planning a journey. A diversion for traffic will be in place via the Antrim Road, Pond Park Road and Derriaghy Road.īallymacash Road (west ) will also close for two weeks and Ballymacash (east) into Lisburn will close for up to six months from the 17 July.įrom September the Prince William Road will revert to two-way traffic with the remainder of the works completed with a mixture of two-way traffic and off peak lane closures.Ī temporary 30mph speed limit will also be in force during construction of the scheme.įurther road closure will be required towards the end of the scheme for surfacing of the junction, however these will be planned to minimise the effect on general traffic. Given the busy nature of Prince William Road, to construct the scheme safely it will be necessary to close the Prince William Road Northbound from Knockmore Road to Nettlehill Road from 17 July for six weeks. The scheme will take approximately nine months to fully complete. The improvement work, which will be carried out by developers following planning permission for residential development in the area, includes the widening of the Prince William Road, extension of the existing underpass at the location and provision of a new traffic signal junction at Ballymacash Road including the provision of PUFFIN controlled pedestrian crossings within the junction layout. A major road improvement scheme at the Prince William Road/ Ballymacash Road junction in Lisburn will commence Monday 17 July 2023.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |